On site contractor

October 11, 2017 1:38 pm Published by

Met with the drafter from the contractors at the Horizon Ridge site. Measurements were taken, and a rough sketch of what we will be doing was drawn up with a budget in mind.

Categorised in:

This post was written by Webmaster

Comments are closed here.